This is the page for the NCB Building, which will hopefully, over the next few weeks, become a fully complete building. As of now, the basic structure of the building is complete and there are 32 complete elevators in total.

Floors: 150 (2 mechanical) + 12 basement
Height to roof: 2100 ft (640.1 m)
Height to spire: 2340 ft (713.2 m)
Elevators: 48 (current plan, 32 complete)
Stairwells: 2 (current plan, 0 complete)
Escalators: 2 (2 complete)

BASIC STRUCTURE: COMPLETE
ELEVATORS: UNDER DEVELOPMENT
ROOMS: UNDER DEVELOPMENT
STAIRWELLS: NOT STARTED
ESCALATORS: COMPLETE
DETAILS: NOT STARTED

Floor plan:
B12-B1: Basement floors
1: Lobby
2-60: Offices
61: Lower skylobby
62-101: Offices (planned)
102-121: Residential (planned)
122: Upper skylobby
123-147: Hotel (planned)
148: Observation deck
M1-M2: Mechanical floors


The zip file contains the building and all textures required for its normal operation.

« Last Edit: September 13, 2018, 11:26:43 AM by stellaruniversexmpls5 » »

Offline cd7890

  • Member
  • *****
  • Posts: 1176
  • My new tower
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #1 on: September 02, 2018, 06:27:17 PM »
interesting design,looking forward to it being awesome
Excelsior complex creator
Floor 301,Sky I *destroyed*
Floor 98,Triton center
Floor 50,Excelsior I
Floors 150,175,200-201,Newmarsh towers,Tower I
I sip my tea on the 500th floor,why do you not understand me?
Why you stole some of my buildings?

You ****!
You must be screwing something up badly if you manage to make the entire simulator crash because of an indicator...

Offline stellaruniversexmpls5

  • Member
  • *****
  • Posts: 9
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #2 on: September 02, 2018, 11:33:57 PM »
The below attachment contains the building with the default font for the number in case you don't have digital.ttf in your data folder:
« Last Edit: September 03, 2018, 12:00:26 AM by stellaruniversexmpls5 » »

Offline stellaruniversexmpls5

  • Member
  • *****
  • Posts: 9
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #3 on: September 03, 2018, 06:29:56 AM »
Building updated, there are now three express elevators instead of one. The zip file contains the building and all dependencies.
« Last Edit: September 03, 2018, 06:42:38 AM by stellaruniversexmpls5 » »

Offline stellaruniversexmpls5

  • Member
  • *****
  • Posts: 9
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #4 on: September 03, 2018, 08:54:58 AM »
3 of the 6 elevators for floors 1-20 added. The rest of the 1-20 elevators and then the 21-40 elevators will come next.

Offline stellaruniversexmpls5

  • Member
  • *****
  • Posts: 9
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #5 on: September 03, 2018, 10:43:15 AM »
The 3 remaining 1-20 elevators and three 21-40 elevators added.

Offline cd7890

  • Member
  • *****
  • Posts: 1176
  • My new tower
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #6 on: September 03, 2018, 11:20:23 AM »
no need to post 2-hourly updates on the development
Excelsior complex creator
Floor 301,Sky I *destroyed*
Floor 98,Triton center
Floor 50,Excelsior I
Floors 150,175,200-201,Newmarsh towers,Tower I
I sip my tea on the 500th floor,why do you not understand me?
Why you stole some of my buildings?

You ****!
You must be screwing something up badly if you manage to make the entire simulator crash because of an indicator...

Offline Kan

  • Member
  • *****
  • Posts: 1486
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #7 on: September 04, 2018, 06:58:07 AM »
Building updated, there are now three express elevators instead of one. The zip file contains the building and all dependencies.
Good start on the building!

Offline stellaruniversexmpls5

  • Member
  • *****
  • Posts: 9
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #8 on: September 04, 2018, 08:54:12 AM »
2 freight elevators and 12 basement floors added.

Offline stellaruniversexmpls5

  • Member
  • *****
  • Posts: 9
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #9 on: September 05, 2018, 08:40:00 AM »
Z-fighting issues fixed, elevators to floor 41-60 added

Offline stellaruniversexmpls5

  • Member
  • *****
  • Posts: 9
Re: NCB Building (UNDER DEVELOPMENT)
« Reply #10 on: September 13, 2018, 11:28:02 AM »
Update summary: 61-80 elevators added, express elevators updated, escalators added

 