Update: August 8th, 2016 3am

I have updated the fixtures in the freight elevator to the later Thyseenkrupp impulse control buttons. I have made these new fixtures myself. Since Dover was bought by Thyseenkrupp in 1999 Thyseenkrupp slightly changed the fixtures. The impulse fixtures stopped production in 2006. Eastinghouse (Fictional Company) decided to buy out these fixtures from Thyseenkrupp and decided to use them to present day. Below is a photo of what a Thyseenkrupp Impulse elevator looks like. I did not take the photo. Look carefully at the screenshots I have uploaded as the changes can't be seen easily from such a large image. According to the Sky II description I wrote this elevator was installed in 2014.

I have to return to work in about a month (September 7th). I should still be able to visit the forums daily but the progress of this integration project will slow down. There still may be two releases per month during the school year(September to May). During the long breaks I should be able to work on this project much more.
« Last Edit: August 08, 2016, 02:54:13 AM by June » »

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #31 on: August 08, 2016, 05:34:48 AM »
Update: August 8th, 2016 6am
I have finished ALL residential units on floors 244 to 274(including two-bedroom units). The stairwells will be in between the old observation deck elevators/executive residential elevators. The crossover floor for the stairwell will be floor 275. The stairwell will be in a different location for floors 275 to 338. I have also given the service corridors proper walls.

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #32 on: August 08, 2016, 11:50:03 PM »
Update: August 9th, 2016 1am
I have started to work on the sky lobbies for the office levels. The 40th floor sky lobby will be the exact same layout as the 20th floor sky lobby. The only difference is that the atriums in the 20th floor sky lobby are three stories and the 40th floor sky lobby only has two-story atriums.

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #33 on: August 09, 2016, 01:09:04 AM »
Update: August 9th, 2016 2am
Does this look familiar? Both the elevator and skylobby for zone 2 are almost complete!

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #34 on: August 09, 2016, 02:46:39 AM »
Update: August 9th, 2016 4am
All of the elevators for zone 2 are complete! The first picture shows the low-rise elevators. The second picture shows the mid-rise elevators. The third picture shows the high-rise elevators. I don't want to go overboard on Sky II. I want to make sure I don't take the original feeling away from the old Sky I. Therefore, Sky lobbies on floors 20, 40, and 80 will have the original style as well as all of the office floors below 119. The floors above 119 will be modernized.

Mini Release August 2016 R2.5 Download Below!

*In order for the Mini Release to work properly the main release of August 2016 R2 must be installed!
« Last Edit: August 09, 2016, 02:53:37 AM by June » »

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #35 on: August 09, 2016, 09:58:40 PM »
Update: August 9th, 2016 11pm

This 80th floor Sky lobby has been a challenge to work with. It uses the same design style as Sky lobbies #1 and #2 but has a different layout. The 120th floor sky lobby will be the same layout as this 80th floor sky lobby but it will be modernized.

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #36 on: August 11, 2016, 05:18:25 PM »
Update: August 11th, 2016 6pm
The 80th floor Skylobby(Zone 3) also has low-rise, mid-rise, and high-rise local elevators. Right now I am finishing the 80th floor skylobby. The 120th floor Skylobby will be much more modern and have the same elevator layout but with WORKING mechanical bells.

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #37 on: August 11, 2016, 07:11:25 PM »
Update: August 11th, 2016 8pm
The 80th floor Skylobby is 90 percent complete along with all of the Zone 3 elevators.

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #38 on: August 11, 2016, 08:30:32 PM »
Update: August 11th, 2016 9pm

Work has started on the Zone 4 offices and Skylobby(Floors 120 to 157)

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #39 on: August 12, 2016, 02:39:07 AM »
Update: August 12th, 2016 3am

ALL of the office sky lobbies are completed(including 120th floor). ALL of the office elevators are completed too(including Zone 4). The layout of the elevators is the same in zone 4 as it was in zone 3.

Elevator layout:

Zone 1:
Lower: 20 - 30
Upper: 30 - 37

Zone 2:
Lower: 40 - 50
Intermediate: 50 - 60
Upper: 60 - 77

Zone 3:
Lower: 80 - 90
Intermediate 90 - 100
Upper: 100 - 117

Zone 4:
Lower: 120 - 130
Intermediate: 130 -140
Upper: 140 - 157

Zone 5:
?

Zone 6:
?

Zone 7:
Lower: 240 - 257
Upper: 258 - 274

Zones 8 and 9:
Main: 276 - 329


Offline rsdworker

  • Member
  • *****
  • Posts: 1219
Re: June's Integration Project
« Reply #40 on: August 12, 2016, 03:40:45 AM »
looks very good so pre build file?

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #41 on: August 12, 2016, 02:51:00 PM »
Thank you! A release will come later tonight. This new build requires new data(as you can see the new ceiling).

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #42 on: August 12, 2016, 08:46:02 PM »
Update: August 12th, 2016 10pm
August 2016 R3 has been released! Please note the the patch requires both August 2016 R2 and August 2016 R2.5 to be installed! If you didn't install August 2016 R2.5 it is just easier to download the full release. Next update I will be working on the internal walls to cover up the shafts on the office levels.

Offline rsdworker

  • Member
  • *****
  • Posts: 1219
Re: June's Integration Project
« Reply #43 on: August 13, 2016, 02:33:15 AM »
missing textures

Code: [Select]
Skyscraper was unable to load the following files.
This will result in texture and/or sound problems:

data/Impulse/Controls_and_Floor_Buttons/HELP.gif
data/Impulse/Controls_and_Floor_Buttons/HELPN.gif
data/Impulse/Controls_and_Floor_Buttons/alarmbutton2.gif
data/Sky2Signs/241to257.png
data/Sky2Signs/258to274.png
data/Sky2Signs/expresstoL.png
data/Sky2Signs/serviceelevators.png
data/ceilingpanel.jpg

Offline June

  • Global Moderator
  • *****
  • Posts: 484
Re: June's Integration Project
« Reply #44 on: August 13, 2016, 02:39:15 AM »
Missing textures download

 

Powered by EzPortal