Are you banned? Problems registering?

Are you banned, but don't think you did wrong? Are you having problems registering? Read this post first. If you still have questions, contact forum staff at staff (at) skyscrapersim (dot) com to get help.

Author Topic: E1512 Integration Project 2018: Combined Releases for All Buildings  (Read 40023 times)

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #420 on: October 15, 2017, 07:11:14 PM »
Update

For the next release of the building, the lower parking levels will be done and completed, while the upper parking levels will begin work. All floors will be started, but will have no interiors so far, which the interiors will be done at a later time. More elevators will be put in, mainly for the hotel room levels.

Offline cd7890

  • Member
  • *****
  • Posts: 1170
  • My new tower
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #421 on: November 04, 2017, 02:37:22 PM »
just a question
seeing as "Appler Tower" was released in your IP,why is it not included with the latest release?
Excelsior complex creator
Floor 301,Sky I *destroyed*
Floor 98,Triton center
Floor 50,Excelsior I
Floors 150,175,200-201,Newmarsh towers,Tower I
I sip my tea on the 500th floor,why do you not understand me?
Why you stole some of my buildings?

You ****!
You must be screwing something up badly if you manage to make the entire simulator crash because of an indicator...

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #422 on: November 04, 2017, 07:44:35 PM »
just a question
seeing as "Appler Tower" was released in your IP,why is it not included with the latest release?
That building? My mistake that it was not included in the latest release that I have done. Once the next release of the integration project is done, then all buildings, including the Appler Tower that you asked about, will be included. Thanks for noticing that in the latest release.

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #423 on: November 10, 2017, 08:03:21 PM »
Since there has not been a release of this integration project in a while, I have plans on making at least one more release soon, maybe this weekend if everything goes planned. For Aralia Tower II,  I will resume working on the building and its layout since I have not made any progress on the building for the last month. A preview of the building that I will upload to YouTube will be done once the building is nearing completion. Stay tuned for any other information about this building.

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #424 on: November 16, 2017, 07:16:41 PM »
Buildings Release - November 16, 2017

I have made a buildings release that contains all of my buildings, which can be downloaded below.

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #425 on: December 16, 2017, 06:58:02 PM »
Aralia Tower II Update

A planned release for Aralia Tower II will be done soon, which will contain added elevators. This integration project hasn't been worked on in a while, but is not officially on hold yet because a release will be done soon. More information to be announced at a later time.

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #426 on: January 15, 2018, 06:53:05 PM »
It has been a while since my last release of any content, but here is an updated Aralia Tower II with added express elevators going from the Lobby to the Podium Level.

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #427 on: February 02, 2018, 07:47:23 PM »
Plans for Aralia Tower III in the Near Future

In the near future, I will begin Aralia Tower III. This will be after the second tower will be completed, which I am not sure when it will be done. A release of this integration project will be done once the second tower is completed, so stay tuned for that!

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #428 on: February 17, 2018, 07:47:45 PM »
Update February 17, 2018
With the new Skyscraper Code Assistant release as a proper building creator, I am considering releasing buildings that way soon, once I get used to how it works. I will use that for any major, detailed building projects that I plan on doing, such as tall towers or detailed convention halls.

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #429 on: March 16, 2018, 09:16:13 PM »
Update March 16, 2018

I haven't posted anything since the last update, but there will be a release soon hopefully, maybe on the Aralia Tower II progress, adding some more elevators to the current beta build. A full release of the integration project won't be done for a little while, maybe only two or three for the entire year at this current rate. Patches, however, will be done more quickly than the full builds. This is a "stay tuned" update for anyone looking for progress on my buildings, which there has not been recently.

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2017: Combined Releases for All Buildings
« Reply #430 on: May 14, 2018, 06:52:50 PM »
Versions Update: May 14, 2018

I haven't updated anything in this integration project since the January 15 2018 fix of Aralia Tower II, but hopefully more free time for me will come soon. With that, I may even create a new building and overhaul this integration project and start on new buildings. If I plan on doing that, I will release an old version of this integration project called "Version 1.0" and have the new version called "Version 2.0." The old version will contain ALL of my buildings from the beginning of this project timeframe to January 15, 2018, and the Version 2.0 will contain any of my future buildings, modifications of buildings, and anything else on there.

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2018: Combined Releases for All Buildings
« Reply #431 on: May 28, 2018, 02:13:02 PM »

The new integration project 2018 logo has been released. Also, it has not been the year 2017 for the past five months so I finally updated the logo. And speaking of updates, I will be doing one soon for Aralia Tower II, and maybe even creating new buildings if possible!

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2018: Combined Releases for All Buildings
« Reply #432 on: June 27, 2018, 12:43:37 PM »

E1512 Integration Project 2018 - Release 1

It has been a year now since my last official release in this integration project, so I have decided to make a release containing only the work that I have done since, including Line Hospital's releases. The Line Hospital File 8 Release I have released will be the first release of 2018 and first in nearly a year.

Line Hospital File 8 Changelog

I have released the current beta of Line Hospital File 8 as of June 27th, 2018. There have been several significant changes to the elevators so far, like the ones in Building 34 (Kone) and Building 35 (Otis). It was suggested by Kan that the elevators be modified sot that they do not look like those BBC -created elevators, so I have taken that and done some major changes to the elevators in File 7 and File 8. The elevators in File 8 have been modified to the point that they look like more normal elevators than ones created from the hands of BBC. This extra work will be extended to the elevators in Buildings 36 and 37; and eventually to all buildings in all files of Line Hospital. The release of the patchwork is available below. So far, the current changes are to the elevators, also below:




« Last Edit: June 27, 2018, 08:58:26 PM by elevator1512 » »

Offline ZZ9_Elevators

  • ZZ9 Productions
  • Member
  • *****
  • Posts: 656
  • Powered by KONE 375LCECPU40 logic
    • My YouTube channel - Skyscrapersim, Elevators & More!
Re: E1512 Integration Project 2018: Combined Releases for All Buildings
« Reply #433 on: June 27, 2018, 03:41:13 PM »

I think u accidentally used the old logo there.
- ZZ9 ;)
Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlpha                          Scratch: ZZ9PluralZAlphaYouTube: ZZ9 Productions                          YouTube: ZZ9 Productions                          YouTube: ZZ9 Productions                          YouTube: ZZ9 Productions                          YouTube: ZZ9 Productions                          YouTube: ZZ9 Productions                          YouTube: ZZ9 Productions                          YouTube: ZZ9 Productions                          YouTube: ZZ9 Productions                          YouTube: ZZ9 Productions
I have a fictional elevator company! I have made a building which has all my own brand of elevators in it.

My top 3 elevator companies:-
  • KONE & Schindler joint 1st
  • Otis
  • ThyssenKrupp

Feel free to give me feedback on my buildings and my YouTube channel! ;D

Quote from: cheapie
1st rule of real life: Anything can happen. It doesn't have to make sense.

Random lift voice of the day: "Please stay calm, help is coming, Please stay calm, help is coming, Please stay calm, help is coming, Please stay calm, help is coming.."

Offline elevator1512

  • Elevator 1512 Productions
  • Member
  • *****
  • Posts: 1060
    • Elevator1512 Productions' Website
Re: E1512 Integration Project 2018: Combined Releases for All Buildings
« Reply #434 on: June 27, 2018, 08:51:18 PM »
I think u accidentally used the old logo there.
That was my mistake because I forgot to change the attachment ID from the old IP-2017 logo to the one that I used for uploading the IP-2018 logo. I didn't notice, so it is good that someone else did  ;)

 

Powered by EzPortal