|
shsav2012
|
 |
« Reply #60 on: March 03, 2010, 06:17:12 pm » |
|
quote from patricnedz "series 3 is european"
|
|
|
|
|
Logged
|
shsav2012 brand dover type tractin compasity 2500lbs speed 500fpm floors served 23 it is the palace hotel
go Red Sox
|
|
|
|
epco_rules
|
 |
« Reply #61 on: March 04, 2010, 04:23:32 pm » |
|
Chris, this is right from that poster you gave me:
MICROMOTION 3 AAA23500AK, BY & CC for Series 2, 3, 4, & 5 Hall Stations, COPs
Need I say more?
|
|
|
|
|
Logged
|
ThyssenKrupp is the elevator company of people who are easily excited by things that sound good on paper but are quite deadly, such as the ISIS.
|
|
|
|
Chris
|
 |
« Reply #62 on: March 04, 2010, 05:05:51 pm » |
|
Chris, this is right from that poster you gave me:
MICROMOTION 3 AAA23500AK, BY & CC for Series 2, 3, 4, & 5 Hall Stations, COPs
Need I say more?
Odd. Patricknedz has this same poster (the actual poster and not a PDF) and he told me that it said nothing about S3.
|
|
|
|
|
Logged
|
|
|
|
|
shsav2012
|
 |
« Reply #63 on: March 04, 2010, 05:33:11 pm » |
|
Chris, this is right from that poster you gave me:
MICROMOTION 3 AAA23500AK, BY & CC for Series 2, 3, 4, & 5 Hall Stations, COPs
Need I say more?
Odd. Patricknedz has this same poster (the actual poster and not a PDF) and he told me that it said nothing about S3. watch the video common OTIS fixtures
|
|
|
|
|
Logged
|
shsav2012 brand dover type tractin compasity 2500lbs speed 500fpm floors served 23 it is the palace hotel
go Red Sox
|
|
|
|
ajfd11111
|
 |
« Reply #64 on: March 07, 2010, 07:06:25 am » |
|
quote from patricnedz "series 3 is european"
I think Beno can provide it. Edit: New Code you'll like it. AddCostumIndicator texture_prefix, direction, mode, CenterX, CenterZ, width, height, voffset
The mode part can fill: Independent = Attendant Service (Costum Word) Inspection = Out Of Service (Costum Word) Alarm = Lift/Elevator Alarm (Costum Word) Fire = (Mode 1) (Costum Word) Fire2 = (Mode 2) (Costum Word) Load = Overloaded DoorClose = Door Closing (Costum Word)
|
|
|
|
« Last Edit: March 12, 2010, 07:16:45 am by ajfd11111 »
|
Logged
|
|
|
|
|
lielevators
|
 |
« Reply #65 on: March 10, 2010, 02:28:03 pm » |
|
Nudge mode depends on the brand of elevator.
Dover: Some use the Dover Buzz, others have the floor indactors blinking
Otis: Most use a low-pitched Dover Buzz with the floor indactor blinking
ThyssenKrupp: All hell breaks loose, Dover Buzz, and blinking arrow and number on floor indactor. Signa4 and Aurua have just number on floor indactor blinking, and of course, with the DOVER BUZZZZZZZZZZZZZZ! That is one reason why Dover/ThyssenKrupp are my least favorite brands of elevator.
KONE: unknown
Schindler: Depends on what model you have, HT and MT.
KONE elevators beep
|
|
|
|
|
Logged
|
|
|
|
|
schin.man.96
|
 |
« Reply #66 on: March 20, 2010, 06:15:22 am » |
|
It also starts buzzing and the doors start to close slowly on you.
Schindler elevators ding repeatedly and KONE elevators make no noise. Also, some Montgomery elevators buzz but don't close. Schindler 500A elevators can be reopened while in nudge mode. So can Otis and TK, but I have never seen a TKE go into nudge. I have made Dovers go into nudge, but the display just blinks. It doesn't buzz, which is odd. i was at a hospital yesterday and i got a dover to go into nudge mode and it buzzed
|
|
|
|
|
Logged
|
|
|
|
|
ElevatorUp9
|
 |
« Reply #67 on: March 20, 2010, 12:26:13 pm » |
|
The outside directional lantern should lit up a floor before the elevator actually is in the floor, so you have time to get in front of that elevator in a big elevator bank. It would be also more realistic.
|
|
|
|
|
Logged
|
|
|
|
|
solka
|
 |
« Reply #68 on: March 24, 2010, 11:09:58 am » |
|
By the way, does this 'Todo List' on the 1st page is updated after Alpha 6 was realised ??
|
|
|
|
|
Logged
|
|
|
|
|
Alex
|
 |
« Reply #69 on: March 24, 2010, 03:51:23 pm » |
|
I say that we Unsticky this topic, and create a new one for alpha 7. I mean a new one.
|
|
|
|
|
Logged
|
|
|
|
|
Chris
|
 |
« Reply #70 on: March 24, 2010, 03:53:31 pm » |
|
I say that we Unsticky this topic, and create a new one for alpha 7. I mean a new one.
Why would we unsticky this? This is the MASTER TO-DO LIST for ALL UPCOMING versions.
|
|
|
|
|
Logged
|
|
|
|
|
Alex
|
 |
« Reply #71 on: March 25, 2010, 01:37:20 pm » |
|
I say that we Unsticky this topic, and create a new one for alpha 7. I mean a new one.
Why would we unsticky this? This is the MASTER TO-DO LIST for ALL UPCOMING versions. I mean unsticky this, and make a NEW " ToDo List" for the next Alpha Release. -Alex
|
|
|
|
|
Logged
|
|
|
|
|
Chris
|
 |
« Reply #72 on: March 25, 2010, 03:09:59 pm » |
|
I say that we Unsticky this topic, and create a new one for alpha 7. I mean a new one.
Why would we unsticky this? This is the MASTER TO-DO LIST for ALL UPCOMING versions. I mean unsticky this, and make a NEW " ToDo List" for the next Alpha Release. -Alex  Why? What is wrong with this one? I am sure that Ryan hasn't planned out exactly what will be in Alpha 7. It just doesn't make sense to create a new one. It wasn't done for any other versions, either.
|
|
|
|
|
Logged
|
|
|
|
|
solka
|
 |
« Reply #73 on: March 25, 2010, 03:38:17 pm » |
|
He means to delete the points that are already done , so like 'refresh' to do list ^^
|
|
|
|
|
Logged
|
|
|
|
|
Chris
|
 |
« Reply #74 on: March 25, 2010, 03:41:26 pm » |
|
He means to delete the points that are already done , so like 'refresh' to do list ^^
Well that is up to Ryan (eventhorizon), it is his list.
|
|
|
|
|
Logged
|
|
|
|
|